Tan Lab Renovations 2002–2003

In preparation for the official opening of the Tan Lab, this laboratory in the Rockefeller Research Laboratories underwent a gut renovation starting in December 2002. Everything but the fumehoods was replaced with brand new construction, including countertops, sinks, casework, desks, filing cabinets, and outlets. A new fire-rated wall was also built at the back of the lab to divide the old 14-bench lab into an 8-bench module to accommodate NYC fire codes. The new lab opened for business in March 2003, embarking on the group’s chemical biology research in diversity-oriented synthesis and rational drug design!

Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research

Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research
Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research
Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research
Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research
Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research
Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research
Lab Renovations, diversity oriented synthesis, rational drug design, and chemical biology research